Risk-based maintenance plan

Maintenance plans established in the hose control system take a risk-based approach to setting inspection and replacement intervals. These intervals can be standardized for an entire system or customized independently for each hose. Our customers can use this information to target risk-reducing measures on individual hoses.


Certified experts from TESS conduct risk assessments, determine risk classes and identify opportunities for risk-reducing measures in collaboration with the customer's key technical personnel. Our staff has extensive experience in evaluating alternative barriers.

 

Risikobasert graf.png

 

Examples of risk-reducing measures:

  • Installing pipe

  • Setting up physical barriers

  • Ensuring spill containment

  • Hose rupture valves

  • Whipcheck

  • Breakaway link/Weak link

Risiko-2.png

 

Want to know more about what we offer?


Jan Georg Thunes
Operational Director THM
+47 951 05 968
jangeorg.thunes@tess.no
Contact


Rune Sigurdsen

Sales Director THM
+47 947 83 828
rune.sigurdsen@tess.no
Contact